Hi all. I'm sure this would have been covered but I was going to chuck some pics and info on the job I'm doing So 62000kms egr electrical block, catch can fitted at 60000 kms
Wiring loome and vacuumed brake line away I got started on removing egr and throttle body. The rear bolts on manifold were tight. I dumped Coolant and removed top turbo water line to allow manifold to slip forward. Now to remove fuel lines and rocker cover. I will need to find valve clearance and intake torque / sequencing settings- will update each stage